Moosmair - Seilbahnen - Bauunternehmung
Home Page








Deutsch Italiano English

MOOSMAIR GMBH
39010 San Martino in Passiria (BZ)
Via dei Legnai, 89
Tel. +39 0473 65 00 66
Fax +39 0473 65 00 93

info@moosmair.com

Malcesine (Verona) – Panoramic cableway
Complete construction of the cableway line (length: 4.325) and construction of the uphill station for the new panoramic cableway „Malcesine - S. Michele - M.te Baldo“ on the Garda Lake. Building times spanned from September 2001 to May 2002 under sometimes bad weather conditions.


Ratschings, Sterzing (Bozen) –Chair lift
Complete construction of the cableway line along with the excavation and concrete works for a six seat chair lift with automatic toothing.


Canazei (Trento) –Two chair lifts
Complete construction of a chair lift with automatic toothing and of a 4 seat chair lift.


Jochtal, Mühlbach (Bozen) –Chair lift
Complete construction of a six seat chair lift with automatic toothing.


Padola, Comelico Superiore (Belluno) –Chair lift
„Turnkey“ construction of a 4 seat chair lift with automatic toothing along with the construction of three stations uphill, downhill and halfway of the mountain in Padola di comelico; Carrying capacity of the telpher line: 6 tons.



Page 1  2  3  4  


  © 2004 | IMPRINT