MOOSMAIR GMBH
39010 San Martino in Passiria (BZ)
Via dei Legnai, 89
Tel. +39 0473 65 00 66
Fax +39 0473 65 00 93
info@moosmair.com
|
 |
|
|
Cermis, Cavalese (Trento) – Gondola Cableway |
|
Complete assembly for the 8 seat gondola cableway line and for the station on the top of the mountain in Cermis, in the municipality of Cavalese, wich was destroyed by an American Jet in February 1998. We completed the new gondola cableway line in a record time of 2,5 months. |
Massaniga (Sondrio) – hydro-electric plant |
|
Development and construction of an hydroelectric power station (4000 Kw) along with penstocks in just 6 months thanks to our three cableways for materials. The client and the direction of the construction works had foreseen a construction time of 2 years. |
London (UK) - Milleniums-Bridge |
|
We supported the construction of the „Milleniumsbridge“ in London with our powerful machineries directly on the premises. (www.mbrigde.ft.com) |
Senales vally (Bozen) – Weirs |
|
For the construction of two weirs in the Senales valley we had to transport two heavy construction machines in the area where they were needed. Carrying capacity of the cables: 18 tons. |
Alagna Valsesia (Vercelli) – Gondola Cableway and chair lift |
|
“Turnkey” realisation of a 8 seat cableway and a 2 seat chair lift along with the two stations uphill and downhill in Alagna (Vercelli). |
|
|